Archive

Archive for May, 2009

B 8212 JW Update: Heavy Engine Block Workout and Interior Duties

May 26, 2009 Ferdy F. Rahman 1 comment
Heavy engin block workout ini menu-nya antara lain:
- Oversize piston 100
- Piston medium compression flat surface
- Light weight crankshaft and lywheel
- Engine balance up to 11.000 RPM
Kalo rapi-rapi interior antara lain:
- Beresin idle RPM drop pada saat AC nyala
- Install head unit and 2 speakers for minimum audio weight addition
- Lepas roll bar dan pasang jok belakang
- Ganti head-lam side marker ke style USDM atau original SR version
- Install original SR3 Honda Civic Floor Mat
Silakan lihat foto-foto-nya di sini.

IMG00005-20090502-1739

Heavy engin block workout ini menu-nya antara lain:

- Oversize piston 100

- Piston medium compression flat surface

- Light weight crankshaft and flywheel

- Engine balance up to 11.000 RPM

Kalo rapi-rapi interior antara lain:

- Beresin idle RPM drop pada saat AC nyala

- Install head unit and 2 speakers for minimum audio weight addition

- Lepas roll bar dan pasang jok belakang

- Ganti head-lam side marker ke style USDM atau original SR version

- Install original SR3 Honda Civic Floor Mat

Silakan lihat foto-foto-nya di sini.

Categories: Automotive, Sports

Test Blogging with CellSpin

test using CellSpin

Categories: Journal

BPWJ Divestment and My New Role

echo_sunset_375x180

Some of you might hear the process of BP West Java, Ltd. (BPWJ) divestment.  Latest update of this divestment process is that BP will fully responsible for securing their employee. Now that’s a relief. But I tell you one thing, nothing is secure until we really know which company that’ll buy BPWJ assets. Why? Because BP standard is pretty fancy for an oil and gas business participants. And the very lack of fulfilling this standard for potential buyers might result in incapability to maintain health and safety environment procedures BP proposed, not to mention employee remuneration. Rumors have been flying about of companies selected as short-listed candidates, including Pertamina.

That one up there is about the company. Now let’s talk about me. Me, me and me. I do not know where this comes from, but I do know that the company has been including me to their long term plan. I can also assume that I am with the selling package. They give me new role and of course paid off with interesting remuneration packages. They labeled my role as Integrity Data Processing Engineer. It means that I am in charge of Mechanical Integrity (MI) Team database-related development. MI Team is one of the team under Integrity & Engineering Support (I&ES) Department. There are at least 9 disciplines inside MI Team: Corrosion, Chemical, Coating, In-Line Inspection, Riser, Pipeline, Mechanical-Pressure System, Structure, and Marine. I am responsible for all of these disciplines. All database development must acknowledge and agreed under my consent. This will include our contractor’s proposed solution for database and IT. Fancy that!

While I am enjoying this new role, the clock still ticking and we have no longer with the BP superior standard within 2 months ahead. I will miss this. 

image taken from bp.com/id

Categories: Journal